Detail Cantuman
Advanced SearchPrinted Material
Critical chain project management
The president of a management consulting firm bemoans that the field of project management has not kept pace with advances in other disciplines and technology. Synthesizing Total Quality Management (TQM), Goldratt's theory of constraints (TOC) entailing changing a system's limiting factor, and the Project Management Institute's 1996 (PMOK), Leach details his successfully field-tested critical chain project management (CCPM) approach. Perhaps the most radical aspect of CCPM is allowing people to complete one project at a time rather than multitask. Includes flow charts and a glossary. Annotation c. Book News, Inc., Portland, OR (booknews.com)
Ketersediaan
31255 | AH/CEQ Lea | General (General) | Tersedia |
Informasi Detil
Judul Seri |
-
|
---|---|
No. Panggil |
AH/CEQ Lea
|
Penerbit | Artech House : Boston., 2000 |
Deskripsi Fisik |
xvii, 330 p. : tabs., figs., gloss., index ; 24 cm
|
Bahasa |
English
|
ISBN/ISSN |
1-58053-074-5
|
Klasifikasi |
AH/CEQ
|
Tipe Isi |
-
|
Tipe Media |
-
|
---|---|
Tipe Pembawa |
-
|
Edisi |
-
|
Subyek | |
Info Detil Spesifik |
-
|
Pernyataan Tanggungjawab |
-
|
Versi lain/terkait
Tidak tersedia versi lain