  <title>On the merits and pitfalls of critical chain sched</title>
 </titleInfo>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text"></placeTerm>
   <publisher></publisher>
   <dateIssued>October 2001</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code"></languageTerm>
  <languageTerm type="text"></languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd"></form>
  <extent>p. 559-577</extent>
 </physicalDescription>
 <note>The direct application of the Theory of Constraints (TOC) to project management, known as Critical Chain Scheduling and Buffer Management (CC/BM), has recently emerged as one of the most popular approaches to project management. It is the objective of this paper to highlight the merits and pitfalls of the CC/BM scheduling approach. Following a short overview of the fundamentals of CC/BM, the strengths and weaknesses of the apporach are put into perspective, based on a critical analysis of the literature as well as our own experiment ation with commercial CC/BM software. The CC/BM scheduling mechanism is tested in a full factorial experiment performed on a set of benchmark problems. It appears that the 50% rule for buffer sizing may lead to a serious overestimation of the required buffer protection. Regulary updating the baseline schedule and the critical chain provides the best intermediate estimates of the final project duration and yields the smallest final project duration. Using clever project scheduling and rescheduling mechanisms such as branch-and-bound, has a beneficiary effect the final makespan.</note>
 <note type="statement of responsibility"></note>
 <classification></classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>Perpustakaan - Sekolah Tinggi Manajemen PPM Pusat Informasi Manajemen</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <recordInfo>
  <recordIdentifier>26704</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2005-12-01 00:00:00</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2005-12-01 00:00:00</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>