<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="29261">
 <titleInfo>
  <title>Spreadsheet modeling in corporate finance</title>
 </titleInfo>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Upper Saddle River</placeTerm>
   <publisher>Prentice Hall</publisher>
   <dateIssued>2002</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code"></languageTerm>
  <languageTerm type="text"></languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd"></form>
  <extent>xiii, 161 p. : 28 cm.</extent>
 </physicalDescription>
 <note>TABLE OF CONTENTS&#13;
&#13;
Preface&#13;
&#13;
I. TIME VALUE OF MONEY.&#13;
1. Single Cash Flow.&#13;
Present Value. Future Value. Problems.&#13;
2. Annuity.&#13;
Present Value. Future Value. System of Four Annuity Variables.&#13;
Problems.&#13;
3. Net Present Value.&#13;
Constant Discount Rate. General Discount Rate. Problems.&#13;
4. Real and Inflation.&#13;
Constant Discount Rate. General Discount Rate. Problems.&#13;
5. Loan Amortization.&#13;
Basics. Sensitivity Analysis. Problems.&#13;
&#13;
II. VALUATION.&#13;
6. Bond Valuation.&#13;
Basics. By Yield To Maturity. System Of Five Bond Variables.&#13;
Dynamic Chart. Problems.&#13;
7. Stock Valuation.&#13;
Two Stage. Dynamic Chart. Problems.&#13;
8. The Yield Curve.&#13;
Obtaining It From Bond Listings. Using It To Price A Coupon Bond.&#13;
Using It To Determine Forward Rates. Problems.&#13;
9. U.S. Yield Curve Dynamics.&#13;
Dynamic Chart. Problems.&#13;
&#13;
III. CAPITAL BUDGETING.&#13;
10. Project NPV.&#13;
Basics. Forecasting Cash Flows. Working Capital. Sensitivity&#13;
Analysis. Problems.&#13;
11. Cost-Reducing Project.&#13;
Basics. Sensitivity Analysis. Problems.&#13;
12. Break-Even Analysis.&#13;
Based On Accounting Profit. Based On NPV. Problems.&#13;
13. Three Valuation Methods.&#13;
Adjusted Present Value. Flows To Equity. Weighted Average Cost&#13;
of Capital. Problems.&#13;
&#13;
IV. FINANCIAL PLANNING.&#13;
14. Corporate Financial Planning.&#13;
Actual. Forecast. Cash Flow. Ratios. Sensitivity. Full-Scale Real&#13;
Data. Problems.&#13;
15. Du Pont System of Ratio Analysis.&#13;
Basics. Problems.&#13;
16. Life-Cycle Financial Planning.&#13;
Basics. Problems.&#13;
&#13;
V. OPTIONS AND CORPORATE FINANCE.&#13;
17. Binomial Option Pricing.&#13;
Single Period. Multi-Period. Risk Neutral. Full-Scale Real Data.&#13;
Problems.&#13;
18. Black Scholes Option Pricing.&#13;
Basics. Dynamic Chart. Continuous Dividend. Implied Volatility.&#13;
Problems.&#13;
19. Debt and Equity Valuation.&#13;
Two Methods. Impact of Risk. Problems.&#13;
20. Real Options.&#13;
Using Black-Scholes. Using The Binomial Model. Sensitivity to&#13;
Standard Deviation. Problems.</note>
 <note type="statement of responsibility"></note>
 <classification>EE/WJBC</classification>
 <identifier type="isbn">0130499056</identifier>
 <location>
  <physicalLocation>Perpustakaan - Sekolah Tinggi Manajemen PPM Pusat Informasi Manajemen</physicalLocation>
  <shelfLocator>EE/WJBC Hol</shelfLocator>
 </location>
 <recordInfo>
  <recordIdentifier>29261</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2003-12-19 00:00:00</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2016-11-01 00:00:00</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>