<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="39412">
 <titleInfo>
  <title>Penetapan lot size optimal untuk material requirem</title>
 </titleInfo>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">Jakarta</placeTerm>
   <publisher>PPM School Of Management</publisher>
   <dateIssued>2010</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code"></languageTerm>
  <languageTerm type="text"></languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd"></form>
  <extent>x, 44 p. : ill., tabs., refs. ; 28 cm.</extent>
 </physicalDescription>
 <note>&lt;div&gt;&#13;
&#13;
Statementof the Problem:&#13;
&lt;br&gt;&lt;span&gt;&lt;span&gt;Nowadays competitions in an industry&#13;
are becoming more intense. &amp;nbsp;This situation&#13;
makes a price war becoming&#13;
more difficult to be implemented. &lt;/span&gt;If&amp;nbsp; &lt;span&gt;companies want to increase their profits per unit of sales, they have to reduce cost of goods sold of their&#13;
products.&amp;nbsp; Because &amp;nbsp;raw&amp;nbsp; &amp;nbsp;materials &amp;nbsp;are &amp;nbsp;sometimes&#13;
&amp;nbsp;high&#13;
&amp;nbsp;in&#13;
&amp;nbsp;costs,&#13;
&amp;nbsp;controlling&#13;
&amp;nbsp;and&#13;
monitoring their demand for a period is necesary to make sure they are spending the orderingcost and carrying cost efficiently&lt;/span&gt;.&lt;/span&gt;&#13;
&#13;
&lt;span&gt;&lt;br&gt;&lt;br&gt;Method Used :&lt;/span&gt;&#13;
&#13;
&amp;nbsp;&#13;
&#13;
&amp;nbsp;&#13;
&#13;
&lt;span&gt;&lt;span&gt;&lt;br&gt;Methods used in this final paper&#13;
are comparison of lot-for&lt;/span&gt;-lot, &amp;nbsp;least unit cost,&#13;
least total cost, &amp;nbsp;part period balancing,&#13;
and period order quantity to find the optimal lot size&#13;
for material requirements planning.&lt;/span&gt;&#13;
&#13;
&lt;/div&gt;&#13;
&#13;
&lt;br&gt;&lt;span&gt;Summary of Findings, Conclusion, and Recommendations :&lt;/span&gt;&#13;
&#13;
&amp;nbsp;&#13;
&#13;
&lt;span&gt;&lt;br&gt;Lot sizing methods that are used in making material requirements planning for cassava, palm oil,&amp;nbsp; &lt;span&gt;and package&#13;
is lot-for-lot using PT Boga Makmur Gracia (BMG)&#13;
policies.All other methods cannot be implemented&lt;/span&gt;, even some of them will give lower&#13;
costs,because there are barrier&#13;
in minimum order from supplier and maximum&#13;
storage capacityfor palm oil in BMG.&lt;/span&gt;&#13;
&#13;
&lt;span&gt;&lt;span&gt;Although there are no&amp;nbsp; savings in result,&#13;
the&amp;nbsp; 3 &amp;nbsp;months material requirements&#13;
planningwill still give BMG a picture of the next 3 &amp;nbsp;months demand of cassava,&#13;
palm oil, &amp;nbsp;and package.&#13;
This material requirements planning will help BMG to monitor how many&#13;
units they need&lt;/span&gt;, &amp;nbsp;when they should order, &amp;nbsp;and when they can expect the order to amve.&lt;/span&gt;&#13;
&#13;
&lt;br&gt;&lt;br&gt;&lt;br&gt;&lt;br&gt;</note>
 <note type="statement of responsibility"></note>
 <classification></classification>
 <identifier type="isbn"></identifier>
 <location>
  <physicalLocation>Perpustakaan - Sekolah Tinggi Manajemen PPM Pusat Informasi Manajemen</physicalLocation>
  <shelfLocator></shelfLocator>
 </location>
 <recordInfo>
  <recordIdentifier>39412</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">2013-03-21 00:00:00</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2015-11-24 00:00:00</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>