Identification and risk management in the expendit



The objective of this research is the design of a mapping of risks which
are mainly related to the processes of expenditure. The research also
serves to identify the actions and the necessary measures to control
risks and the delays of completing a construction project. The
literature from the last two decades related to this field was examined.
A quantitative analysis of risks in the expense process of building
projects sample representing various regions of Morocco allows
identifying the risks and ranking them by determining their occurrences
and impacts. Eight major risks, 43 measures, 52 actions and 10
performance indicators are linked to these risks have been identified.
[ABSTRACT FROM AUTHOR]


Ketersediaan

Tidak ada salinan data


Informasi Detil

Judul Seri
-
No. Panggil
-
Penerbit Gadjah Mada University : Yogyakarta.,
Deskripsi Fisik
p. 1 - 26
Bahasa
ISBN/ISSN
1411-1128
Klasifikasi
-
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
-
Subyek
-
Info Detil Spesifik
-
Pernyataan Tanggungjawab

Versi lain/terkait

Tidak tersedia versi lain




Informasi


DETAIL CANTUMAN


Kembali ke sebelumnyaXML DetailCite this