Advanced SearchIdentification and risk management in the expendit
The objective of this research is the design of a mapping of risks which
are mainly related to the processes of expenditure. The research also
serves to identify the actions and the necessary measures to control
risks and the delays of completing a construction project. The
literature from the last two decades related to this field was examined.
A quantitative analysis of risks in the expense process of building
projects sample representing various regions of Morocco allows
identifying the risks and ranking them by determining their occurrences
and impacts. Eight major risks, 43 measures, 52 actions and 10
performance indicators are linked to these risks have been identified.
[ABSTRACT FROM AUTHOR]
Ketersediaan
Tidak ada salinan data
Informasi Detil
Judul Seri |
-
|
---|---|
No. Panggil |
-
|
Penerbit | Gadjah Mada University : Yogyakarta., January - April 2013 |
Deskripsi Fisik |
p. 1 - 26
|
Bahasa | |
ISBN/ISSN |
1411-1128
|
Klasifikasi |
-
|
Tipe Isi |
-
|
Tipe Media |
-
|
---|---|
Tipe Pembawa |
-
|
Edisi |
-
|
Subyek |
-
|
Info Detil Spesifik |
-
|
Pernyataan Tanggungjawab |
-
|
Versi lain/terkait
Tidak tersedia versi lain