<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" id="48053">
 <titleInfo>
  <title>Production planning and scheduling in flexible assembly system</title>
 </titleInfo>
 <name type="Personal Name" authority="">
  <namePart>Sawik, Tadeusz</namePart>
  <role>
   <roleTerm type="text">Primary Author</roleTerm>
  </role>
 </name>
 <typeOfResource manuscript="no" collection="yes">mixed material</typeOfResource>
 <genre authority="marcgt">bibliography</genre>
 <originInfo>
  <place>
   <placeTerm type="text">New York</placeTerm>
   <publisher>Springer</publisher>
   <dateIssued>1999</dateIssued>
  </place>
 </originInfo>
 <language>
  <languageTerm type="code">en</languageTerm>
  <languageTerm type="text">English</languageTerm>
 </language>
 <physicalDescription>
  <form authority="gmd">Printed Material</form>
  <extent>xiii, 207 p. : figs., tabs., index. ; 23.5 cm.</extent>
 </physicalDescription>
 <note>&lt;br&gt;&lt;br&gt;The book familiarizes the reader with the flexible assembly systems &#13;
planning and scheduling issues and various operations research modelling&#13;
 and solution approaches. Some of the many topic highlights presented &#13;
are the                             overall structure and components of a&#13;
 flexible assembly system, bi-objective integer programming models and &#13;
algorithms for machine loading, assembly routing, and assembly plan &#13;
selection, and fast combinatorial heuristics for                        &#13;
     scheduling flexible assembly lines with limited intermediate &#13;
buffers. Also the book deals with just-in-time scheduling of flexible &#13;
assembly lines, and dynamic dispatching algorithms for simultaneous &#13;
scheduling of assembly                             stations and &#13;
automated guided vehicles.&lt;br&gt;</note>
 <note type="statement of responsibility"></note>
 <subject authority="">
  <topic>Production planning</topic>
 </subject>
 <subject authority="">
  <topic>Production management</topic>
 </subject>
 <subject authority="">
  <topic>Production scheduling</topic>
 </subject>
 <classification>CEB</classification>
 <identifier type="isbn">9783540649984</identifier>
 <location>
  <physicalLocation>Perpustakaan - Sekolah Tinggi Manajemen PPM Pusat Informasi Manajemen</physicalLocation>
  <shelfLocator>CEB Saw</shelfLocator>
  <holdingSimple>
   <copyInformation>
    <numerationAndChronology type="1">37235</numerationAndChronology>
    <sublocation>Restricted (Restricted)</sublocation>
    <shelfLocator>CEB Saw</shelfLocator>
   </copyInformation>
  </holdingSimple>
 </location>
 <recordInfo>
  <recordIdentifier>48053</recordIdentifier>
  <recordCreationDate encoding="w3cdtf">0000-00-00 00:00:00</recordCreationDate>
  <recordChangeDate encoding="w3cdtf">2021-04-19 11:55:09</recordChangeDate>
  <recordOrigin>machine generated</recordOrigin>
 </recordInfo>
</mods>
</modsCollection>